Find Vna Pallet Rack, Storage Racks, Pallets on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Home > Products > Boltless Steel Shelf > medium duty powder coated steel rack shelf for spare parts

medium duty powder coated steel rack shelf for spare parts

Basic Info

Model No.: TE-1243

Product Description

Product Description

Specifications of rack shelf for spare parts: 

Regular Upright Size  40*80 / 55*60 / 70*90 mm ; thickness: 1.2/1.5mm
Regular Step Beam Size  30*50 / 40*60 / 50*80 / 50*110 / 50*120 mm 
Rugular Panel Thickness  0.7mm , 0.8mm
Pitch  50mm , 75mm
Surface Treatment  Static powder coated
Strusture  assembled easily
Material  high quality cold rolled steel
Customized  Yes! The size, color, package can be custom made as per your requests.

 

Product Details

 

powder coated steel rack shelf for spare parts has a wonderful looks and scientific structures.

1, The upright is made of cold rolled steel sheet.

2, It has double lines of holes.

3, Its beam is "P" type beam, and the height is matched with the shelf panels.

4, The shelf panels are also made of cold roll steel.

5, Load capability each set is 250 ~ 500kgs.

6, It's convenient to disassemble and assemble; it is widely used in the supermarket, Warehouse and other public fields.

 

 

Cases Show

 
Packaging & Shipping

Packaging&Shipping for rack shelf for spare parts:

1, Packing: experienced standard export seaworthy packing; custom packaging is also acceptable.

2, Delivery: sea Transportation , Qingdao port.

Production Flow

 

   Drive-in Pallet Rack          Mezzanine Floor/Rack            Cantilever Racking                 Stacking Rack

Company Information

 

Shandong Topeasy Industrial Equipment Co.,Ltd., located in Weifang, China, own a professional technical team involved in the industry for 15 years, is a specialized manufacturer and supplier in the field of shelving & racking systems, storage equipment & accessories and storage solutions & services.

We provide more than storage equipment. We combine top quality with on-time delivery at a competitive price and help customers to obtain the biggest benefit. 

Our Services

Business Scope of Topeasy Industry:

Light duty rack Selective Pallet Racking VNA  Pallet Racking Wire mesh panel Tyre storage rack
Modular wire shelving Double-deep pallet racking Mezzanine Rack Wire Mesh Container Flow rack
Slotted angle shelving Drive In pallet racking Steel platform Steel Pallet Plastic Pallet
Boltless rivet shelving Radio shuttle racking Mobile shelving Storage Cage Turnover box
Longspan shelving Cantilever racking Stacking rack Steel pallet box Powder Coating

FAQ

 
Q1 What’s your trading terms?
(1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C O/A also available.
(2) Lead time: normally in 15-25 days after deposit received.
(3) Sample policy: samples are always available for each model. Samples can be ready in 7-15 days once payment received.
(4) Shipping port: Qingdao, China.
(5) Discounts: we offer good discount for large quantity.
Q2 How can I deliver my goods?
(1) Sea freight: we will update sea freight once we know your sea port where goods will be delivered.
(2) Agent designated by client: please tell us the contact detail of your shipping agent and we will arrange to deliver the items.
Q3 What is your service?
(1) Your inquiry related to our products or price will be replied in 12 hours.
(2) Well-trained and experienced staffs to answer all your inquiries in fluent English.
(3) OEM & ODM, any your customized racking we can help you to design product.
(4) We have very experienced professional engineers to make best solutions.
Q4 What's the international trading process?
A: Design drawing → Confirm drawing → Quotation → PI → Confirm PI → Arrange 30% deposit → Manufacture → QC inspect → Pay balance → Shipping
Q5 Does Topeasy Industry have MOQ (minimum order quantity) limitation?
A:

No, but good quantity comes with good price.

We recommend the order quantity for regular products of Topeasy Industry to fit at least one 20ft. container, which is about 15 tons.

 

Product Categories : Boltless Steel Shelf